Installer Checklist Everything the integration needs for full operation is enabled at the
controller's installer level by your heating installer — the integration
itself never unlocks anything and needs no access code. Print this page
(browser print dialog, Destination → Save as PDF ) and hand it to your
installer; every item can be ticked off in a few minutes on site.
Printable translations of this checklist: Español · Italiano · Română · Čeština · Polski
1. Network
☐
Item
Notes / value
☐
Fixed IP address for the Navigator (DHCP reservation in the router or static on the controller)
IP: ______________________
☐
Navigator and Home Assistant reach each other in the same local network
☐
No port forwarding or internet exposure for ports 502, 80 and 61220 — everything stays local
2. Modbus — required, the backbone
☐
Item
Notes / value
☐
Building management system (Gebäudeleittechnik) → Modbus TCP → On / Ein
☐
TCP port left at the default
normally 502
☐
Slave/unit ID
normally 1
☐
Controller clock shows the correct local date and time
3. PV / GLT — optional: PV surplus, battery, external room sensors
☐
Item
Notes
☐
PV signal source set to Building management / Smartfox (no native inverter polling by the controller)
☐
GLT input registers released (74–86: surplus, PV production, house consumption, battery power, battery SOC)
☐
No other energy manager writes to the same GLT registers
4. Local web interface — optional: web-only fallback and extra values
☐
Item
Notes / value
☐
Network/web PIN set on the controller and handed over to you
PIN: ______________________
☐
Web interface reachable in the local network (HTTP port 80; Navigator 10 additionally WebSocket port 61220)
Item
Value
Navigator generation (1.0 / 1.7 / 2.0 / Pro / 10)
______________________
Software/firmware version (service menu or web page)
______________________
System scheme number (Anlagenschema , e.g. L7.1)
______________________
Active heating circuits (A–G)
______________________
Zone modules and rooms per module
______________________
Cascade present? Number of units
______________________
Solar thermal / ISC module present?
______________________
What the integration does not need
No cloud access and no myIDM account — control stays 100 % local
No port forwarding, no DMZ, no external access of any kind
No unlocking of installer menus during operation
Once your installer has confirmed the items above, continue with
Installation and Setup .
← Previous page Installation and Setup
Next page Configuration
→